Avances en la hidráulica de redes de distribución de agua potable - page 477

475
R
ehabilitación
de
tuberías
de
agua
potable
EPA, (Environmental protection agency) “
Drinking water infrastructure needs survey
”, First
report to the congress, EPA. Office of water, EPA 812-R-97 -001. January 1997 Washin-
gton D.C. USA.
Herz R.K. (1995) “
The impact of social cost on the rehabilitation needs of water distribution ne-
tworks
”. Intemational NoDig’95 Conference Documentation, 99 24-38. CCH, Hamburg
1995
Herz R.K. (1996), “
Ageing pracesses and rehabilitation needs of drinking water distribution ne-
tworks
”, Journal Aqua, 45,1996 pp. 221 - 231
Herz R.K. (1998) “
Exploring rehabilitation needs and strategies for water distribution networks
“,
Journal Aqua, 47, 1998 pp. 275 - 283
Hirner W. “
Maintenance and rehabilitation policies for urban water systems
”. Water manage-
ment intemational, 1997a, pp 13-24
Hirner W. “
Technical, operational and economic performance indicators of water utilities
”. Actas
del IWSA workshop on Performance indicators and distribution systems. LNEC. Lis-
boa. 5- 7 Mayo 1997 b.
Jones, B.J. “
Pigs cleanup pipeline - The effects of alterning the Hazen - Williams C factor
” Water
and wastes Engineering, oct., 1978
Lansey, K, Basnet E, Mays L., y Woodburn, J.; “
Optimal Maintenance Scheduling for Water
Distribution Systems
”, Civ. Engrg. Systems, 9 Gordon and Breach Science Publ., U.K.,
211-226, 1992.
Male lW., Walski T.M. Slutskt A.H.,
Analysing water main replacement policies
” Joumal of
Water Resources Planning and Management. ASCE., May - June, pp. 362-374, 1990
Mc Elroy lM. “
Water pipeline infrastructure: questions and answers
” In. AWWA 1985 Distribu-
tion System Symposium Proceedings. Seattle, Washington, August, 1985
Newport, R. (1981) “
Factors injluencing the occurrence of bursts in iron water mains. Severn
Trent Water Authority, Great Britai
n”, Joumal Aqua, N° 3,1981 pp. 2.14 - 278
Parsons D. P. (1997) “
Managing benejits of mains rehabilitation through structure surveys
”. Ac-
tas del IWSA workshop on performance s indicators and distribution systems. LNEC.
Lisboa. 5-7 mayo 1997
Skarda B.C.; “
Diagnosis methods and performance indicators for rehabilitation policies - a Swiss
point ofview: Pipeline network renewal
”. Special Subject 3, IWSA World Congress. Sep-
tiembre 1995. Durban. África del Sur
Skarda B.C. “
The Swiss experience with performance indications and special viewpoints on water
networks’’
. Actas del IWSA workshop on performance indications and distributions
systems. LNEC. Lisboa. 5-7 mayo 1997
Shamir U. and Howard Ch., “
An analytic approach to scheduling pipe replacement, Management
and Operations
”, A WW A, 1979.
Victorica J. L. Y Sánchez 1. ; “
Origen de los incrementos del coeficiente de pérdida de carga por
fricción en los acueductos
”, Tlaloc, año V, # 13, sept. - dic. de 1998.
Walski T. and Pelliccia A. “
Economic analysis of water main breaks
“, Research and Technolo-
gy, Journal AWWA, 1982
Walski T., “
Economic analysis of rehabilitations of water mains
”, Water main rehabilitation,
October 1982.
1...,467,468,469,470,471,472,473,474,475,476 478,479,480,481,482,483,484,485,486,487,...502